Wet and Dry Riser Systems
Dry Riser System (Inlets)
An inlet breeching at ground level provides the connection to the water supply. The system is normally dry and is charged by the fire brigade in an emergency. Breeching inlets have either 2 or 4 inlet connections complete with 2.5” male instantaneous inlets to BS336 fitted with non-return valves, 1” drain valve and caps and chains. A 100mm (4”) rising main uses a 2-way inlet breeching in a vertical or horizontal position. A 150mm (6”) rising main uses a 4-Way inlet breeching. Inlet Breechings comply with the requirements of BS 5041 Part 3.
The Breechings are normally housed in inlet cabinets, normally recessed into the external wall of the building in a vertical or horizontal position, 4 -way breechings in a square inlet breeching cabinet, manufactured in accordance with BS 5041 Part 5. Cabinets for foam inlets are available on request.
| Vertical Inlet Cabinets | |||||||||||||||||||||||||
|
|
||||||||||||||||||||||||
| 2-Way Inlet Breeching Valve | |||||||||||||||||||||||||
|
|
||||||||||||||||||||||||
Dry Riser System (Outlets)
Dry riser gate valves act as outlets from the riser main.These valves are situated on each floor of the high rise building and are normally housed in outlet cabinets which are manufactured to BS5041 part 4. Dry riser gate valves come complete with inlets flanged 65mm BS4504 PN16, 2.5”BS10 table D and screwed 2.5” BSPT, outlets to BS336, complete with blank cap and chain, strap and padlock, complying to BS5041 part 2. To the top of riser should be fitted with an air release valve which releases all air from the riser, as water is pumped in, but closes automatically under pressure of water. A 1” drain valve can be used at the bottom of the riser if the pipe work goes below the inlet breeching valve, so the system can be completely drained.
| Dry Riser Outlet Cabinet | |||||||||||||||||||||||||
|
|
||||||||||||||||||||||||
| Dry Riser Gate Valve | |||||||||||||||||||||||||
|
|
||||||||||||||||||||||||